Thursday, May 27, 2010

New Half-Bath


Well, it took almost a month (thanks kids), but the downstairs bath is finally finished.

This project taught me several lessons:
  1. Measuring twice before cutting is not enough.
  2. When holding a paint brush, your hand is not as steady as you think it is.
  3. Drywall anchors really mess up a wall, but it is nothing that a mirror can't hide.
  4. There is not a hole big enough that it can't be filled by caulk.
  5. Finally, I don't believe that anyone can actually use a coping saw.

Thanks to David for trying to teach me how to hang chair rail correctly. I'll get it one of these days.

I tried to find some pictures of this room before it was re-done, but apparently it was not a room that was photographed often. Go figure.